QUALITY DEPARTMENT

In Every System Uncompromising Quality

A rigorous quality process from component procurement to customer acceptance testing.

Quality Unit

End-to-End
Quality Management

EPC Enerji's Quality Unit manages processes spanning from incoming material inspection through in-process controls, system integration tests, Factory Acceptance Testing (FAT), and Site Acceptance Testing (SAT). Post-delivery warranty and service processes are also an integral part of the quality cycle.

Incoming Quality Control
Factory Acceptance Test (FAT)
Warranty & Field Follow-up
Quality Process Flow

6 Stages of Complete Control

01
IQC
Incoming Material Inspection

All components received from suppliers undergo incoming quality control against technical specifications. Non-conforming materials are not admitted to production.

02
IPQC
In-Process Inspection

Intermediate checks are performed at each assembly stage. Wiring, soldering, and component placement are verified throughout.

03
Integration
System Integration Test

Following the assembly of all modules, functional and electrical system tests are conducted to verify full system integrity.

04
FAT
Factory Acceptance Test

Formal acceptance testing carried out at the factory with the participation of the customer's representative.

05
SAT
Site Acceptance Test

When required, commissioning and functional verification testing performed on-site following installation.

06
After-Sales
Warranty & Field Follow-up

Post-delivery fault tracking, field intervention, and reporting within the scope of the warranty.

Documents

Downloadable Technical Documents

PDF
FAT Procedure

Factory Acceptance Test scope, test scenarios, and acceptance criteria.

Download
PDF
SAT Procedure

Site Acceptance Test steps and commissioning checklist.

Download
PDF
Service Scope Document

Warranty period, service coverage, and response times.

Download